JobsUS jobs › Generator Stacker - 2nd Shift

Generator Stacker - 2nd Shift

GE Vernova · Pensacola

Employment
Permanent
Posted
21 Sep 2026

Required skills, as the advert states them

About this opportunity

Job Description Summary This role may train initially on 1st shift but once trained the primary shift will be 2nd shift. Assemble, bend, form, mold, braze, tape, and stack generator parts, assemblies and components performing all operations on both Services and New Production Work. Perform lower rated work as required.

Read the full advert and apply on GE Vernova's site →

Collected from GE Vernova's own careers site (Workday). Posted 21 Sep 2026. TUNAI shows an excerpt and the facts it read from the advert; the employer's page has the full description and the application.

Does your CV match this job? Paste both and see exactly which of these skills it shows.

Check my CV against this job →

Or see every live job you already qualify for →