JobsUS jobs › Data Center Construction Cost Estimator (Nashville, TN)

Data Center Construction Cost Estimator (Nashville, TN)

Oracle · Nashville, TN, United States

Work pattern
On-site
Employment
Permanent
Posted
26 Aug 2026

Required skills, as the advert states them

Nice to have

About this opportunity

Oracle is seeking a Construction Cost Estimator (IC3) to support data center development, build-out, and infrastructure delivery across multiple regions. This is a hands-on estimating role responsible for preparing conceptual, budgetary, and detailed construction estimates across civil, structural, architectural, mechanical, electrical, plumbing, fire protection, controls, low-voltage, security, network, and site-infrastructure scopes.

Read the full advert and apply on Oracle's site →

Collected from Oracle's own careers site (Oracle). Posted 26 Aug 2026. TUNAI shows an excerpt and the facts it read from the advert; the employer's page has the full description and the application.

Does your CV match this job? Paste both and see exactly which of these skills it shows.

Check my CV against this job →

Or see every live job you already qualify for →